The 8,500 square metre warehouse in Channel Commercial Park at Titanic Quarter, replaced the nearby operation which opened in 2018 as a temporary facility while Amazon secured a site to meet long-term needs.
Construction of a warehouse involves many critical decisions including construction materials – to ensure long term, uninterrupted operation of the facility. Creagh were delighted to design and supply materials and technical expertise for the new Belfast operation. The warehouse needed a durable, sustainable and versatile floor. Creagh’s bespoke concrete floor provided a reliable solution, leaving the new delivery station with a strong, safe, smart, floor fulfilling the client’s specification. Designed and built by Creagh, approx 2,100m3 of in-situ concrete was poured in 7 days. The car park for the site also hosts Creagh’s precast walls and concrete floor.