Creagh designed and constructed a FM2 jointless floor for a new warehouse in Bushmills. To support the surface, 50mm of quarry dust blinding was required before 1,297m³ of 225mm deep steel fiber-reinforced concrete was poured.

Project Details
Client
Cleary Contracting
Location
Bushmills, Co. Antrim
Products Used
Creagh carried out the installation of all isolation joints and carried out all finishing works including:
• Grading and compacting of quarry dust to floor make up level
• Laying of 1200 gauge polythene
• Tera-Joints, installed at designed locations
• Column surrounds installed as per design
• Steel fibre mix
• Laid using laser screed
• SIKA shake top dust (hard wearing, fibre suppressant)
• Power-floated finish
• Sealed with SIKA Pro-Seal
• Expansion joints 20mm around perimeter and column surrounds
• Mastic works to expansion joints (to be completed)