University of Greenwich, student accommodation

McLaren choose our precast concrete

McLaren Group turned to Creagh when tasked with the build of a new student accommodation for University of Greenwich. The project comprises 3 multi-storey buildings housing 358 residents, all built with a precast concrete frame.

Precast concrete was the obvious choice on this project for McLaren. It is speed of construction that underlines the attractiveness of using precast concrete systems as a framing material. Units are manufactured offsite ensuring the desired quality is met and leads to reduction of trades required onsite.

We were responsible for the design, manufacture, delivery and installation of all members of the precast concrete frame including precast columns and beams, hollowcore flooring, walls, lift shafts and precast stairs and landings.

Project Details

Client

McLaren Construction


Location

London, England


Products Used

Rapidcore – Box Cores, Stairs and Landings, Prestressed Hollowcore

Need help with your project?

Get in touch today